Where is this project?

The project construction will be limited to Granada, Cordova and Bridge streets, south of King Street (for the stormwater infrastructure upgrades). There will also be construction on South Street where Lake Maria Sanchez drains into the existing marsh for the stormwater pump station. Finally, the flood wall will be located on the south side of South Street, between the upland (higher ground) and wetlands/marsh. However, the project area benefiting from the stormwater improvements is approximately 200 acres. This is bordered by Martin Luther King Avenue on the West, Avenida Menendez on the East, South Street on the south and Saragossa Street to the north. Please refer to the Basis of Design Report for the project scope and location details.