When should I pay utility connection charges?

The City will not begin any work to provide service until connection fees are paid. Pay utility connection charges well in advance of when you expect to need utility service. It is your responsibility to allow enough time for service to be provided. Check your Availability Statement for the estimated time required to provide service.

Keep Your Receipt

A paid receipt for utility connection charges is required for a Utility Commitment, Building Permit, Business License or Certificate of Occupancy. Your Availability response will state a payment deadline or expiration date after which the response and quoted fees become void.

Show All Answers

1. How can I get information about utility service?
2. What are utility flow-based fees for typical uses?
3. What are the payment options for utility connection charges?
4. How long will it take to provide water/sewer service to a residence?
5. When should I pay utility connection charges?
6. When will the city install new utility services to a residence?
7. Where will the new water/sewer services be located for my residence?
8. How do I unlock my water meter, set up, activate or change a city utility account?
9. Why are utility connection fees charged?
10. What do I need to do if I have a change-of-use, increase in use or additional use at my property?
11. If my water/sewer is already connected, why do I need an availability request form?
12. Are utility connection charges transferable or refundable?
13. Do utility connection charges expire?
14. What needs to happen if a building connected to city water and sewer is being demolished?
15. The property is outside city limits; why should I contact the City for utility service?
16. Is city water/sewer connection mandatory?
17. What is the difference between gravity sewer versus pressurized (forcemain) sewer?
18. How do I get installation and connection of private building service line to water/sewer service?
19. What are the requirements for existing well and septic tank after connection to city water/sewer?
20. What is the responsibility for maintenance and repair of service connections?
21. What is the landscape irrigation water meter?
22. What are the backflow prevention requirements?
23. Is the city responsible for water/sewer service installation?